SAFETY: NTA-8776 certified for E-Bike usage, MIPS B-Series rotational impact system
MAXIMUM COOL: 14 total vented ports for cool air in and drawing heat out
HIGHLY ADJUSTABLE: full 360-degree fit retention system with 3-way rear height adjustment, 3-way adjustable screwless visor
COMFORT: Side strap adjusters,
Troy Lee Designs: 40 years of racing for the World's Fastest Racers
وصف
MIPS-equipped and eMTB-rated, the Flowline SE sets the standard for safety within a modern, minimalist design. With 14 vents, a liner, and a Fidlock magnetic buckle system, Flowline SE is the workhorse of trail helmets.