Search

Home / Safavieh / Home Décor
SAFAVIEH Webster Collection Runner Rug - 2'6" x 10', Grey & Beige, Distressed Viscose Design, Ideal for High Traffic Areas in Living Room, Bedroom (WBS326G) in Saudi Arabia SAFAVIEH Webster Collection Runner Rug - 2'6" x 10', Grey & Beige, Distressed Viscose Design, Ideal for High Traffic Areas in Living Room, Bedroom (WBS326G) in Saudi Arabia SAFAVIEH Webster Collection Runner Rug - 2'6" x 10', Grey & Beige, Distressed Viscose Design, Ideal for High Traffic Areas in Living Room, Bedroom (WBS326G) in Saudi Arabia SAFAVIEH Webster Collection Runner Rug - 2'6" x 10', Grey & Beige, Distressed Viscose Design, Ideal for High Traffic Areas in Living Room, Bedroom (WBS326G) in Saudi Arabia SAFAVIEH Webster Collection Runner Rug - 2'6" x 10', Grey & Beige, Distressed Viscose Design, Ideal for High Traffic Areas in Living Room, Bedroom (WBS326G) in Saudi Arabia SAFAVIEH Webster Collection Runner Rug - 2'6" x 10', Grey & Beige, Distressed Viscose Design, Ideal for High Traffic Areas in Living Room, Bedroom (WBS326G) in Saudi Arabia SAFAVIEH Webster Collection Runner Rug - 2'6" x 10', Grey & Beige, Distressed Viscose Design, Ideal for High Traffic Areas in Living Room, Bedroom (WBS326G) in Saudi Arabia SAFAVIEH Webster Collection Runner Rug - 2'6" x 10', Grey & Beige, Distressed Viscose Design, Ideal for High Traffic Areas in Living Room, Bedroom (WBS326G) in Saudi Arabia

SAFAVIEH Webster Collection Accent Rug - 2'6" x 4', Grey & Beige, Distressed Viscose Design, Ideal for High Traffic Areas in Entryway, Living Room, Bedroom (WBS326G)

SAR 207

Brand
Safavieh
Category
Home Décor
1 +

Special Features

  • Vintage designs work beautifully in the home and can be styled in a shabby chic, contemporary, traditional, or casual fashion
  • Refined machine-woven construction ensures an easy-care and virtually non-shedding rug
  • Made from ultra silky soft premium polyester and viscose fibers
  • Low 0.25-inch pile thickness for a sleek look
  • Safavieh has been a trusted brand and leader in home furnishings for over 100 years, providing quality craftsmanship, unmatched style, and the latest trends; Begin your rug search with Safavieh and explore over 100,000 products today

Description

Perfect for today's transitional homes, the Webster rug collection features new interpretations of traditional rug artistry. Featuring an antique patina with silky soft viscose and polyester fibers, these rugs create a stunning vintage look in any room. Sophisticated fringed edges create an elegant upscale designer look.

Related Items


{"error":"Error","cart_limit":"You have too many items in your cart.","prod_limit":"You cannot add any more of this item"}