Search

Home / invoxia / GPS, Finders & Accessories
Invoxia GPS PRO Tracker - Real-time Location - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months Battery Life in Saudi Arabia Invoxia GPS PRO Tracker - Real-time Location - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months Battery Life in Saudi Arabia Invoxia GPS PRO Tracker - Real-time Location - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months Battery Life in Saudi Arabia Invoxia GPS PRO Tracker - Real-time Location - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months Battery Life in Saudi Arabia Invoxia GPS PRO Tracker - Real-time Location - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months Battery Life in Saudi Arabia Invoxia GPS PRO Tracker - Real-time Location - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months Battery Life in Saudi Arabia Invoxia GPS PRO Tracker - Real-time Location - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months Battery Life in Saudi Arabia Invoxia GPS PRO Tracker - Real-time Location - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months Battery Life in Saudi Arabia

Invoxia GPS PRO Tracker - Real-time Location - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months Battery Life 1 Year Subscription Included

SAR 637

Brand
invoxia
Weight
28 g
Availability
In stock
Model name1 Year Subscription Included
All electronics ship with US style plugs. You may need a voltage converter or a plug adapter.
– 1 +

Special Features

  • REAL-TIME GPS TRACKING INCLUDED: Monitor your vehicle, motorcycle, trailer, RV, boat, or valuable equipment with live GPS tracking and instant location updates through the Invoxia mobile app. Includes 1 year of cellular connectivity for immediate use.
  • 1-YEAR SUBSCRIPTION INCLUDED: Start tracking right out of the box with 12 months of cellular service included. No SIM card installation or additional setup required to access GPS tracking and smart alerts.
  • INSTANT THEFT ALERTS: Receive immediate notifications when suspicious movement is detected. Advanced motion detection helps you react quickly and stay informed about your vehicle's location at all times.
  • LONG-LASTING BATTERY LIFE: Enjoy months of autonomy on a single charge. Designed for continuous protection with minimal maintenance, reducing the need for frequent recharging.
  • SMART SECURITY FEATURES: Create custom geofences, review location history, and receive movement notifications directly on your smartphone. Ideal for cars, motorcycles, RVs, trailers, boats, construction equipment, and other valuable assets.

Related Items


{"error":"Error","cart_limit":"You have too many items in your cart.","prod_limit":"You cannot add any more of this item"}